FAR 52.214-23 — Late submissions, modifications, revisions, and withdrawals of technical proposals under two-step sealed bidding.
Plain-English Summary
FAR clause 52.214-23, "Late submissions, modifications, revisions, and withdrawals of technical proposals under two-step sealed bidding.," is part of FAR Part 52. This clause does not flow down to subcontractors.
Full Clause Text
Flow-Down Requirements
FAR 52.214-23 does not contain flow-down requirements. Prime contractors are not required to include this clause in subcontracts.
-
Is FAR 52.214-23 mandatory?
FAR 52.214-23 is prescribed by the relevant FAR part. Whether it is mandatory depends on the contract type, dollar threshold, and other factors specified in the prescription.
-
What does FAR 52.214-23 mean in plain English?
FAR 52.214-23, "Late submissions, modifications, revisions, and withdrawals of technical proposals under two-step sealed bidding.," establishes requirements for the prime contractor. Refer to the plain-English summary above for a detailed explanation.
-
Does FAR 52.214-23 affect subcontractors?
No. FAR 52.214-23 does not include flow-down provisions and applies only at the prime contract level.
Data sourced from eCFR . Federal contracting data is public domain.