FAR 52.225-14 — Inconsistency between English Version and Translation of Contract.
Plain-English Summary
FAR clause 52.225-14, "Inconsistency between English Version and Translation of Contract.," is part of FAR Part 52. This clause does not flow down to subcontractors.
Full Clause Text
Flow-Down Requirements
FAR 52.225-14 does not contain flow-down requirements. Prime contractors are not required to include this clause in subcontracts.
-
Is FAR 52.225-14 mandatory?
FAR 52.225-14 is prescribed by the relevant FAR part. Whether it is mandatory depends on the contract type, dollar threshold, and other factors specified in the prescription.
-
What does FAR 52.225-14 mean in plain English?
FAR 52.225-14, "Inconsistency between English Version and Translation of Contract.," establishes requirements for the prime contractor. Refer to the plain-English summary above for a detailed explanation.
-
Does FAR 52.225-14 affect subcontractors?
No. FAR 52.225-14 does not include flow-down provisions and applies only at the prime contract level.